motor install

Cement Season at Horner

It’s cement outage season in Indiana with Horner doing work in Greencastle, Louisville, Logansport, Speed, and Mitchell IN. A Central Indiana cement plant is conducting their largest Maintenance and Repair outage in 20 years. They needed to replace an entire section of both the kiln and raw mill. The company brought in a 700-ton mobile crane to the plant site requiring 78 semi loads of support to set up. The time needed for these extended kiln and mill repairs allowed the customer to do all other outage work in the same 6-week timeframe. Washington Street, Terre Haute and HMS are all [...]

Cement Season at Horner2021-02-18T18:28:09+00:00

Toshiba Drive Assembly

        We are in the process of working on a project at a major University. What’s interesting is what they’re going to be using the equipment for once we’re completed. The Toshiba Medium Voltage Drive assembly has been put in place. It is 27 feet long and 8 feet tall. The unit is fed with 13,999 V power that reduced to 4160V through a built-in transformer that powers power to the 4160V VFD section of the unit. Horner Field Service Techs Rick Collins and Gary Anderson were able to set and connect the equipment on site with the [...]

Toshiba Drive Assembly2021-01-10T17:23:47+00:00
Go to Top