5,000KVA Transformer Failure

An Iron and Metal Recycling Facility, Located in Dayton, Ohio called and had a transformer fail and was asking for help. I contacted Don Morris to asked for his assistance. Between Don and Mike Butler, we decided to get Springfield Field Service involved. Jim Delawder and I were to make a site visit, collect photos and information to feed back to Don for evaluation. Dan Sneary showed up on site and did a temporary repair to get the transformer back on-line. In the meanwhile, Matt Velandingham was able to source a replacement transformer. The new transformer had a 50 working day [...]

5,000KVA Transformer Failure2021-01-10T17:16:22+00:00

Power Loss At Foundry Results in Only One Shift of Downtime

On August 14 while at a forging plant in Portland In, Horner technicians were already onsite for arc flash data collection. During this time the entire plant experienced a power loss as one of their eight padmount transformers failing. Mike Croft and Ryan Haffenden were already onsite and were immediately called upon to assess the situation. Upon inspection, the far south compressor room transformer had experienced a catastrophic event on one of the load break elbows and cutout fuses of the 15 KV line feeding the transformer. After initial testing of the transformer it was quickly realized that the transformer was [...]

Power Loss At Foundry Results in Only One Shift of Downtime2019-09-09T17:40:49+00:00

Go to Top