Cement Season at Horner

It’s cement outage season in Indiana with Horner doing work in Greencastle, Louisville, Logansport, Speed, and Mitchell IN. A Central Indiana cement plant is conducting their largest Maintenance and Repair outage in 20 years. They needed to replace an entire section of both the kiln and raw mill. The company brought in a 700-ton mobile crane to the plant site requiring 78 semi loads of support to set up. The time needed for these extended kiln and mill repairs allowed the customer to do all other outage work in the same 6-week timeframe. Washington Street, Terre Haute and HMS are all [...]

Cement Season at Horner2021-02-18T18:28:09+00:00

Pipeline Motor Base and Loctite Coatings

A Pipeline Company had a project that was going late into October due to a 1250HP 4160V motor upgrade to a more modern frame. Once the original large existing GE 2300V motor was removed from the sled base, the surface was checked for flatness and it was found to be out close to .125”. This obviously was not acceptable for a 2 pole motor that was direct coupled to a Sulzer propane pump. Matt Phelps of Horner Fan&Fab had quoted a transition base for the newer 4160V more modern frame to meet the D dim. (shaft height). The general practice for [...]

Pipeline Motor Base and Loctite Coatings2019-09-09T18:00:50+00:00

Go to Top