Cement Season at Horner

It’s cement outage season in Indiana with Horner doing work in Greencastle, Louisville, Logansport, Speed, and Mitchell IN. A Central Indiana cement plant is conducting their largest Maintenance and Repair outage in 20 years. They needed to replace an entire section of both the kiln and raw mill. The company brought in a 700-ton mobile crane to the plant site requiring 78 semi loads of support to set up. The time needed for these extended kiln and mill repairs allowed the customer to do all other outage work in the same 6-week timeframe. Washington Street, Terre Haute and HMS are all [...]

Cement Season at Horner2021-02-18T18:28:09+00:00

From Scrap To Like New

A brick manufacturer had a large fan that pulls air, brick and cement dust thru an overhead duct system into a bag house then through the fan and up a stack. The baghouse requires cleaning frequently and during the cleaning cycle the baghouse is bypassed and the material goes through the fan. This causes buildup on the fan blades and thus an imbalance and vibration. The vibration is so severe it cracks the motor base, bearing base and fan housing. The customer has attempted to deal with this by filling the fan base with concrete, welding large angle iron to the [...]

From Scrap To Like New2019-09-03T20:16:15+00:00

Go to Top